Standard Operating Procedures

Section B: Startup Checklist

  • Pump is off and has power (check circuit panel across from leaching unit–the switch forpump power is green, fourth from the top.).
  • Recycled Solvent Tank Outlet Valve (V102) is closed.
  • Solvent Tanks’ Drain Valve (V103) is closed.
  • Solvent Overflow Valve (V104) is closed.
  • Pumped Solvent Leaching Inlet Valve (V105) is opened.
  • Leaching Vessel Drain Valve (V106) is closed.
  • Dye-infused bricks are NOT in leaching vessel.

Concept

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Section B: Operation with Pure Solvent

  1. When all valves are in the correct position, open V101 to allow flow to the pump.
  2. Turn on the pump using the powerbar switch to the right of the recycled solvent tank.
  3. If there are signs of cavitation, turn off pump, close V101 and open drain valve (V103). When liquid is drained, close V103 and return to step (1).
  4. If there is too much flow to constant-head overflow device (i.e. water is overflowing), reduce water supply by adjusting V101.
  5. Adjust flowrate of solvent to leaching vessel by adjusting pumped solvent leaching vessel inlet valve V105.
  6. When desired steady state is achieved (all flowrates are as desired), open V106 and drain the leaching vessel to the halfway point. (This is to prevent overflow when introducing the dye-infused firebricks into leaching vessel).
  7. Insert mesh basket filled with dye-infused bricks into leaching vessel.

Section B: Shutdown Checklist

  1. Pump is turned off.
  2. V101 is closed.
  3. Liquid line is drained with V103.
  4. Leaching vessel drained with V106 .

Section C: Startup Checklist

  1. Pump is off and has power (check circuitpanel across from leaching unit–the switch forpump power is green, fourth from the top.).
  2. Pure Solvent Tank Outlet Valve (V101) is closed.
  3. Solvent Tanks’ Drain Valve (V103) is closed.
  4. Solvent Overflow Valve (V104) is open.
  5. Pumped Solvent Leaching Inlet Valve (V105) is opened.
  6. Leaching Vessel Drain Valve (V106) is closed.
  7. Leaching Vessel Discharge Line is in position B (right side).
  8. Dye-infused bricks are NOT in leaching vessel .

Section C: Operation with Recycled Solvent

  1. When all valves are in the correct position, open V102 to allow flow to the pump.
  2. Turn on the pump using the powerbar switch to the right of the recycled solvent tank.
  3. If there are signs of cavitation, turn off pump, close V102 and open drain valve (V103).When liquid is drained, close V103 and return to step (1).
  4. If there is too much flow to constant-head overflow device (i.e. water is overflowing).reduce water supply by adjusting V102.
  5. Adjust flowrate of solvent to leaching vessel by adjusting pumped solvent leaching vessel inlet valve V105.
  6. When desired steady state is achieved (all flowrates are as desired), open V106 and drain leaching vessel to the halfway point. (This is to prevent overflow when introducing the dye-infused firebricks into leaching vessel).
  7. Insert mesh basket filled with dye-infused bricks into leaching vessel.

Section C: Shutdown Checklist

  1. Pump is turned off.
  2. V102 is closed.
  3. Liquid line is drained with V103.
  4. Leaching vessel drained with V106.

Section D: Startup Checklist

  1. Steam inlet valves V201 and V202 are closed.
  2. Steam Pressure Reducing Valve (V203) is fully closedo NOTE: This type of valve is the opposite to all other valves–clockwise rotationopens the valve, counterclockwise rotation closes the valve.
  3. Heated Solvent Drain (V205) is closed.
  4. Heated Solvent Leaching Vessel Inlet Valve (V206) is open.
  5. Leaching Vessel Discharge Line is in position A (left side).
  6. Dye-infused bricks are NOT in leaching vessel.

Section D: Operationg with Heated Solvent

  1. Open steam inlet valve 1 (V201). This can be opened fully.
  2. Open steam inlet valve 2 (V202). This can be opened fully.
  3. Slowly open steam pressure reducing valve (V203) by turning clockwise. Do so until you see flow through the tubes in the steam heat exchanger (HX201).
  4. Slowly open cooling water inlet valve (V204) until you see water flow in the condenser at the top of the unit (HX202)
  5. From this point, continuing opening the steam pressure reducing valve (V203) slowly (around 2 notches every 30 seconds) until the steam pressure gauge (PI-201) reads 15 psig OR until there is a rolling boil in the reboiler vessel (T-201)
  6. Continue to adjust the cooling water flowrate by adjusting V204. If steam is seenexiting the condenser from the right-hand side, the cooling water flowrate is insufficient. Ideally you should see condensate occurring along the left half of the condenser, otherwise the cooling water flowrate may be too high.
  7. When a desired steady-state is achieved (all flowrates are as desired), open V106 and drain leaching vessel to the halfway point. (This is to prevent overflow when introducing the dye-infused firebricks into leaching vessel).
  8. Insert mesh basket filled with dye-infused bricks into leaching vessel.

Section D: Shutdown Checklist

  1. V201 is closed first, and after approximately 1 minute, V202 is closed as well.
  2. V203 can be left open for any residue steam to exit the system. Close after ~5 minutes.
  3. Leaching vessel is drained using V106.