Equipment Description
The unit for this experiment is very simple. It consists a tank filled with water where there are 4 valves found at the bottoms. These valves can opened or closed to investigate the effect of gravity on the flow of the fluid out of the tank.
Background & Theory
To review concepts behind the leaching process, click here.
Piping and Instrumentation Diagram
Gallery
Safety
-
Clean area after experiments especially water spills
-
Careful when filling up tank to not overflow
STANDARD OPERATION PROCEDURE
Startup Checklist
-
Cylindrical tank is empty
-
Buckets and trays are beneath apparatus
-
Water valve is closed
-
Check to see if tank is filled with water
Startup Procedure
A. Gravity Tank
1. Fill up tank with water up to past the 25 cm mark
2. Place bucket in position to capture discharge water from the orifice pipe.
3. Remove the stopper from the end of the pipe to measure the efflux-time from the desired orifice. Measure the efflux-time when the water level reaches the 24, 23, 22, 21, 20 and 19 cm mark for the two combinations:
a. Horizontal positioning
Diameter of 0.125 in, Length of 6 in, differing orifice shapes
Diameter of 0.305 in, Length of 2 in, differing orifice shapes
b. Vertical positioning
Diameter of 0.247 in, Length of 6 in, differing orifice shapes
Diameter of 0.305 in, Length of 2 in, differing orifice shapes
4. Once measurement is complete, place stopper onto pipe to terminate flow and empty the bucket.
B. Procedure For Orifice with length zero
Using the cylindrical tank, measure the efflux-time for the horizontal and vertical orifice with no pipe attached
Horizontal Position
-
Fill up cylindrical tank with water using water valve
2. Place an empty bucket in position to capture discharged water from the orifice pipe.
3. Measure the efflux-time for the horizontal orifice with no pipe attached.
Vertical Position
1. Fill up cylindrical tank with water using water valve
2. Place an empty bucket in position to capture discharged water from the orifice pipe
3. Measure the efflux-time for the vertical orifice with no pipe attached
4. Place bucket in position to capture discharge water from the orifice pipe. Measure the efflux-time for the vertical orifice with no pipe attached.
Shutdown Procedure
1. Empty all buckets with water
2. Empty the cylindrical tank
3. Fill the horizontal tanks with water to the required level
Shutdown Checklist
-
Ensure all pipes are capped with plugs in gravity tanks
-
Cylindrical tank is empty
-
Buckets and trays are below apparatus